Decoration waterproof series

CEMENT-BASED POLYMERS

Send Inquiry
Product Introduction

Product features

1. Polymer modification: Strengthen the adhesion to various substrates.

2. Breathable and non permeable: The surface is breathable and can prevent the formation of water vapor pressure, while also not leaking water, with good waterproof performance.

3. Good flexibility: able to withstand slight vibrations and no more than 2-3mm wide displacement (flexible and waterproof).

4. Strong weather resistance: It has a wide range of applications and can be used in exposed environments, such as rooftops.

5. Easy construction: Based on cement-based products, ceramic tiles, plastering or painting can be directly laid on top of the waterproof layer.

6. Wet areas can be used for construction: As the coating must penetrate through the action of water to the interior of the substrate, construction can be carried out in damp areas. For example, if the concrete is dry, it must be soaked with water before construction.

7. Environmental protection: non-toxic and harmless, can be directly applied to the drinking water pool.

8. Hazard: Non flammable materials, non corrosive.


Product number: LD-2101

Product specifications: 18KG 9KG


Construction steps

1. Before construction, the ground should be kept sufficiently moist and there should be no accumulated water on the surface

2. Apply this product evenly on the construction surface, and for larger cracks, use polyester cloth for reinforcement coating treatment

3. Brush again at intervals of 5 hours or more at room temperature outdoors, and do not let water enter within 48 hours after construction

Common problems during construction

Phenomenon: Difficulty in waterproofing construction

1. The substrate is too loose, the substrate is too dry, and the water absorption rate is high;

2. Uneven grassroots and lack of grassroots cleaning;

3. High construction environment temperature;

4. Not blending according to the correct product ratio.

Phenomenon: Sedimentation occurs during construction

1. Not blending according to the correct product ratio;

2. Over usage time.

Phenomenon: Cracking of waterproof coating after construction

1. Untreated cracks in the substrate;

2. The base layer is dry and not wet;

3. Excessive thickness during one-time construction;

4. Special old parts have not undergone waterproof reinforcement treatment;

5. High temperature construction and rapid drying;

6. The smoothness of the base layer is poor, and the coating thickness is uneven.

Phenomenon: After waterproofing construction, there is whitening and alkalinization

1. High environmental humidity, high substrate humidity, and slow drying speed;

2. One application is too thick.


Matters needing attention

1. The temperature during construction should be between 5 ° C-35 ° C, and outdoor construction is prohibited on windy or rainy days; In case of low temperature and high humidity weather, it is necessary to extend the re coating maintenance time appropriately to achieve the best coating effect.

2. The slurry after opening should be used up within 2 hours.

3. Wet the base surface with clean water before construction, but there should be no exposed water on the base surface.

4. The storage temperature of liquid components should not be lower than 0 ° C.

5. Do not mix dried adhesive with water before use.

6. Before construction, please carefully read the construction instructions.

7. Please use appropriate protective measures during construction, such as gloves.