Colorful and easy to apply waterproof coating is a two-component waterproof material composed of advanced German technology and imported raw materials, modified with high polymer acrylic acid and high-quality inorganic powder composite. When the two components are mixed, they can form a tough and elastic waterproof film through the combination action, with strong adhesion, good durability, high strength, aging resistance and no deformation. It can form a permanent bond with the concrete base, thereby preventing water infiltration, and is harmless, non-toxic, and environmentally friendly.
Product number: LD-2003
Product specifications: 17KG
1. Strong flexibility, crack resistance, and adhesion
The film formation speed is fast, and it has good repair and bonding properties for commonly used building materials such as metal/ceramic/concrete base/asbestos tiles/floor tiles
2. Efficient waterproof lightweight brick water tank
Lanton waterproof coating has excellent waterproof and sealing performance
Lanton waterproof coating has excellent waterproof performance. When the waterproof coating is evenly applied to lightweight bricks, it can be cured and tested with water, and can quickly transform into a water pool
3. Impermeable, moisture-proof, flexible, and resistant to bumps, saving time and effort, making it easy to solve waterproofing problems
The Lanton waterproof coating adopts an environmentally friendly upgraded formula, which is easy to apply, forms a film in one, has strong adhesion, does not empty, and is efficient in waterproofing
4. Strong waterproof and breathable adhesion, with strong waterproof and breathable performance
Lanton waterproof coating has excellent moisture-proof and mildew proof characteristics, with strong bonding, penetrating into the base layer, and good waterproof and breathable properties
Wide applicability
Especially suitable for overall waterproofing, anti-seepage, and moisture-proof in areas with long-term water resistance requirements, such as bathrooms, kitchens, enclosed balconies, building exterior walls, underground buildings, floors, etc., and with small displacement of the base layer
Construction technology
1. Grassroots cleaning
The surface of the base layer should be flat and solid, without sand, cracks, dust, oil stains, etc., in order to treat the surface as flat as possible and wet it with water.
2. Mixing products
First, pour the liquid material into the bucket, stir while adding the powder, and stir evenly.
3. Product Painting
Use the cross brushing method to apply 2-3 times, with the interval between each application being one time before the dry and non sticky hand as the benchmark.
Common problems during construction
Phenomenon: Difficulty in waterproofing construction
1. The substrate is too loose, the substrate is too dry, and the water absorption rate is high;
2. Uneven grassroots and lack of grassroots cleaning;
3. High construction environment temperature;
4. Failure to mix and match products correctly.
Phenomenon: Sedimentation occurs during construction
1. Not blending according to the correct product ratio;
2. Over usage time.
Phenomenon: Cracking of waterproof coating after construction
1. Untreated cracks in the substrate;
2. The base layer is dry and not wet;
3. Excessive thickness during one-time construction;
4. Special phonemes have not undergone waterproof star treatment;
5. High temperature construction and rapid drying;
6. The smoothness of the base layer is poor, and the coating thickness is uneven.
Phenomenon: After waterproofing construction, there is whitening and alkalinization
1. High environmental humidity, high substrate humidity, and slow drying speed;
2. One application is too thick.
Matters needing attention
1. The temperature during construction should be between 5 ° C and 35 ° C, and outdoor construction is prohibited on windy or rainy days; In case of low temperature and high humidity weather, it is necessary to extend the re coating maintenance time appropriately to achieve the best coating effect.
2. The slurry after opening should be used up within 2 hours.
3. Wet the base surface with clean water before construction, but there should be no exposed water on the base surface.
4. The storage temperature of liquid components should not be lower than 0 ° C.
5. Do not mix the dried adhesive with water before use.
6. Before construction, please carefully read the construction instructions.
7. Please use appropriate protective measures such as gloves during construction.
You Might Also Like
-