banner

Decorative accessories series

SUPER SOLID

Send Inquiry
Product Introduction

Super strong ground reinforcement is composed of imported polymer through multiple processes. The polymer can penetrate the cement floor, firmly block the loose particles of the cement floor, form a tight integration of the ground, facilitate the close combination of decorative materials and the ground, and effectively prevent the hollowing phenomenon of floor tiles. Ground reinforcement is water-resistant and moisture-proof, which can also prevent the deformation of wooden floors caused by moisture erosion, and at the same time prevent dust from spreading out from the gaps in the floor in the future.


Product number: LD-3701

Product specifications: 18KG


Product features

1. Water and moisture resistance can prevent the deformation of wooden floors caused by moisture erosion, and at the same time, prevent dust from spreading out from the gaps in the floor in the future.

2. Non toxic and odorless.

3. Strong permeability.

4. High bonding strength.


Why use land consolidation?

1. Moisture and mold resistance increase binding strength

After laying the floor for a period of time, there will be hollowing due to moisture absorption and water backflow, causing the floor to expand and making a clean room messy.

2. Moisture proof and drum proof sealing base layer

If the bathroom floor is soaked in water for a long time, it is necessary to have a good foundation, otherwise it is easy to make the floor tiles hollow and burst. Therefore, it is necessary to use ground reinforcement to prevent such situations from happening.

3. Grassroots treatment to prevent dust accumulation

The problem of cement floors easily getting dusty has been troubling us for a long time. How can a neat and beautiful floor tolerate dust? Strengthening the foundation surface with ground reinforcement can prevent dust.


Construction Steps - Base Layer Gluing

1. Grassroots treatment and dust cleaning

Remove the floating soil, oil stains, and loose layers at the grassroots level to ensure that the ground is clean, not loose, dust-free, and free of grease

2. Detailed node processing

Repair and improve the internal and external corners as well as the heel of the pipe with Lanton Sealing King. If the substrate has strong water absorption, it can be moistened with clean water first

3. Configure the mixing interface agent

Dilute the ground solid with water, it is recommended to use an electric mixer

4. Base layer adhesive coating

Use a roller or brush to apply the ground reinforcement to the base layer, and use the cross shaped method to apply it on a large area. The next process can only proceed after the moisture evaporates


Matters needing attention

1. The construction temperature should be between 5-35 degrees.

2. After painting, wait for 1-2 hours of drying before proceeding to the next step of construction; Under poor ventilation conditions, the drying time needs to be appropriately extended.

3. This product cannot be mixed with other adhesive products. Old walls need to be removed and cleaned before using this product.


You Might Also Like

    标签arclist报错:指定属性 typeid 的栏目ID不存在。

Send Inquiry

Welcome to leave a message

Looking forward to cooperating with you