banner

Functional Repair series

Roof-exposed Wateroroof Coating

Send Inquiry
Product Introduction

Tianmian red rubber roof exposed waterproof coating is a rubber waterproof coating made of rubber lotion as the base material, together with high-grade imported resin lotion, additives and fillers. It has excellent viscosity and elasticity functions, is environmentally friendly and pollution-free, and is easy to apply as a single component. After the construction is completed, there is no fear of material cracking caused by changes in the temperature difference between day and night, so the leak repair effect is more durable.


Product number: LD-7377

Product specification: 18KG


Product features

1. Can withstand high and low temperatures.

2. After film formation, it has strong elasticity and strong resistance to tensile cracking

3. Extremely strong weather resistance and good waterproof performance

4. Resistant to natural aging and chemical corrosion such as acid and alkali.

5. Single component water-based products with good environmental friendliness and excellent construction performance


Construction technology 

1. Process the base surface, requiring it to be flat and free of dust, oil, paint, and other pollutants;

2. Use tools to evenly apply red rubber waterproof coating to the construction area. Depending on the usage environment and performance, it is recommended to apply two to three times or more

3. When the crack is large, apply it once first, then cover it with polyester cloth and apply it again once;

4. After applying each layer, wait for 4-6 hours (preferably without touching hands), and then apply the second layer again, with the direction perpendicular to the first layer for better coverage.


Matters needing attention

1. The temperature during construction should be between 5 ° C and 40 ° C. Construction should not be carried out on rainy, snowy, windy and sandy days, or in temperatures below 5 ° C.

2. The area with exposed water and leakage should be pre treated before construction can proceed.

3. The waterproof coating should be completely dry before surface decoration construction can be carried out.

4. After the construction is completed, it is prohibited to step on it within 24 hours, and attention should be paid to protecting the waterproof layer from damage.

5. The product is ready to use and the remaining materials should be used up as soon as possible. After opening the barrel for more than 4 hours, it should be sealed in a timely manner.


You Might Also Like

    标签arclist报错:指定属性 typeid 的栏目ID不存在。

Send Inquiry

Welcome to leave a message

Looking forward to cooperating with you