banner

Functional Repair series

Gu Sha Bao

Send Inquiry
Product Introduction

This product is an environment-friendly single component water-based lotion, mainly using high-grade polymer lotion and additives as the main raw materials. The secondary reaction forms a strong sealing and curing strengthening adhesive. This product has extremely strong penetration. Applying it to a low strength base layer can achieve a penetrating effect, thoroughly strengthen the base development, and improve the hardness of the base layer. The resistance to temperature change, shrinkage and aging of the adhesive film is enhanced, and the strengthened strength of this product will not be affected by thermal expansion, cold contraction and temperature changes. The adhesive film will be surface dried for 4 hours at normal temperature and dry for 24 hours.


Product number: LD-3702

Product specifications: 18KG 5KG


Wide applicability

1. Cement ground

2. Roof/Wall

3. Basement

4. Workshop building

5. Rough room

6. Low hardness putty wall


Construction steps

01 Cleaning the base surface

1. Clean the base surface without any hollowing, peeling, or other debris.

2. Keep the base surface dry (do not sprinkle water)

02 Direct painting

Apply a roller, brush, or spray can evenly on the base surface 1-2 times, and the second time can be done after the first time is dry.


Matters needing attention

1. The construction temperature should be between 5-35 ° C, as high or low temperatures can affect the construction quality.

2. It is not recommended to mix water or add cement when using, otherwise it will affect the effectiveness of use; This product is strictly prohibited from being mixed with other solvents.

3. Within 24 hours after the completion of construction, it is prohibited to come into contact with water.

4. Before construction, the walls or floors must be kept dry and cannot be watered or washed.

5. There is peeling on the walls and floors. If there is peeling or loosening, it must be cleaned first.

If a second coat is required, it should be applied every 2-4 hours.

7. The spraying must be fully penetrated, and if the base surface is severely sanded, it is recommended to spray a second coat.


You Might Also Like

    标签arclist报错:指定属性 typeid 的栏目ID不存在。

Send Inquiry

Welcome to leave a message

Looking forward to cooperating with you